Peninsular Arrival Checks Are Now Open!
HANTAR KERETASEMENANJUNG

BOX CHECK-IN / PKG

Enclosed movement still needs a loading plan.

Six decisions covering dimensions, shared or exclusive use, packing, restraint, release and the final quotation.Open the six check-in cards ↓
Container method for a Port Klang arrival
BOXINBOUND CONTROL COPY

CHECK-IN CARDS / 01

Six decisions, kept in one sequence.

The exact document or operational requirement follows the current booking and named vehicle.
  1. 01BOX
    Vehicle dimensions

    Vehicle dimensions

    Confirm clearance before choosing the loading plan.

  2. 02BOX
    Shared or exclusive

    Shared or exclusive

    Identify consolidation or exclusive use.

  3. 03BOX
    Packing scope

    Packing scope

    Separate preparation from sea freight.

  4. 04BOX
    Restraint plan

    Restraint plan

    Use the arrangement approved for the vehicle.

  5. 05BOX
    Release scope

    Release scope

    Confirm Port Klang handling and collection.

  6. 06BOX
    Final quotation

    Final quotation

    Name every included and optional item.

SCOPE GATE / 02

Keep verified facts and open questions separate.

READY

Carry forward

  • Named vehicle and origin
  • Current booking reference
  • Condition and acknowledgement trail
CHECK

Confirm first

  • Operator-specific acceptance
  • Insurance inclusion and wording
  • Optional land movement

BOX CHECK / WHATSAPP

Confirm the required file before handover.

Chat on WhatsApp